Architecture

Architecture

Monday, April 11, 2011

OMG...what a month.

Hey Everybody

The month of March and start of April was a very hectic month as we had to hand in 1407 drawings to municipality. This was a very long and stressful prtoject and I am GLAD to be done with it. We had to print aproximatly 20 pages for every single drawing consisting of A4 forms and A3 plans. So if you do the math we altogether approximatly printed more than 28000 sheets of paper and that is only the correctlly printed sheets. We probably printed 1000 error sheets which we had to correct afterwards.

The most frustrating thing is when you think you are finished with one section of work and it is completly printed out and then you find one thing wrong that has to be chenged in the at whole section. I hated my life at these pionts in time but it was a good learning experience where you are able to realise your own mistakes and then correct them.

This work was a lot of repetition and after all this work Im sure I will never forget what is needed in a municiple drawing. I would also like to apologize for the lack of blog reports, as you can see in the pictures below, I was very busy so please understand.

Hope you guys have a fun week a head.

Bye :)

TABLE 1

TABLE 2

TABLE 3

No comments:

Post a Comment