Hey :)
This week was a week that was filled with work. The Aan de Weber project had to be completed for the clients to review the units they would be buying. Leading up to today was a very stressful and hard working week. We had to complete units before today in order for us to give a good presentationt o the client. This would of been not that much work to do, but becuase we are still waiting for the hard drive to return from Cape Town we had to use back up drawing files of the unit types. This meant that the units were not up to date with the latest changes. Units with the a drawing title of A had to be I, drawing titles with B had to be D etc. After making sure that we had all the neccessary units and they were correctly named we were able to update the drawing to the what would have been the latest drawings. The problem with these unit type Auto CAD drawings was the lines of the walls... There were lines that were not straight and its not major that you can see it, they were minute so I would have to zoom in and out trying to delete lines that are not suppose to be there. This had to be done otherwise when it came to hatching the walls it would not hatch. The most frustrating thing about all these drawings was that they were done by an archtitect at the firm. One would think that an architect with some experience would know how to draw up a proper drawing.
After correcting all the lines I was able to work more productively. After this it was a continuous crit process with every sigle drawing, changing this changing that until the senior architect was satified. This continued till this afternoon, it has been a hard and long week. Luckily for me we are able to watch the rugby in the firm which made my day a lot better being a big Springbok supporter. That was a hard game thank goodness we were able to hold out to the end.
Till next Firday, have a good one :)
No comments:
Post a Comment